28th Army Operational Directive
207 MRD will secure via Defensive operations the Army
Northern Flank. The intention is to pin
West German units and flanking British formations by the threat of an assault
along the estimated NATO inter Corp boundary which is expected to be along the
line of the E34 Autobahn. 207 MRD will
be reinforced with the Army AT Battalion and an additional Engineer battalion
to create strongpoints as required to prevent NATO forces North of the
Mittleland Kanal from attacking into the Flank of the Army main effort. The Divisional Artillery Group will be
reinforced with one Battalion of D20 howitzers from the Army Canon Regiment
with its attendant special weapon contingent.
The remaining MRD will attack on Divisional frontages
(120km). Each Division is to push a
Forward detachment through the NATO defences into their rear areas as soon as
possible. These forward detachments are
not to engage in an fight of attrition with NATO units but seek routes around
defended locations to disrupt the enemy Rear zones and seize suitable crossings
over the R Weser.
12 GTD will be follow behind the main attack and will
exploit any success. Once pushed through
the main NATO defence it is to be pulled forward by the Forward Detachments
across the R Weser.